Evening folks,

Could anybody advise please, our new building has 3 phase electric and each being 100amps. One sparky has told us if we switch on our new heating we will overload the system, another says that's rubbish. Without collecting all the ratings, is there a meter anybody knows we could attach to the board/main meter to measure max current being drawn to see if we are close to the limit, thanks